Drilling & boring
Auger boring contractors
When a crossing has to be dead straight and on grade, and the road or railroad above it cannot be disturbed, auger boring with a steel casing is the method engineers specify.
How auger boring works
A pit is excavated on one side of the crossing and a track is set in it at the exact line and grade of the design. A boring machine on the track pushes a steel casing forward while a rotating auger inside the casing cuts the face and carries the spoil back to the pit. Casing sections are welded on as the bore advances. When the casing breaks through at the receiving pit, the auger is withdrawn and the carrier pipe, usually the actual water, sewer or gas line, is installed inside the casing on spacers, with the ends sealed.
Where it is the right answer
Auger boring is the standard for highway and railroad crossings because the casing supports the ground continuously and the grade is held mechanically rather than by steering. State DOTs and railroads commonly require a cased crossing under their embankments. It is also the method for gravity sewer crossings where the slope has to be exact, and for culverts and storm drains under existing roads. Typical diameters run from 8 inches to 60 inches of casing; lengths of 40 to 300 feet are routine, and longer bores are done with intermediate steering heads or pilot-tube guidance.
Ground conditions
Auger boring works best in stable soils that stand up at the face: clay, silt, mixed soils and soft rock. Running sand below the water table and large cobbles or boulders are the hard cases, handled with a casing that stays ahead of the auger, dewatering, or switching to a different method such as pipe ramming or microtunneling. A contractor who has bored in your soil knows which case you have before the machine arrives.
Comparing auger boring to HDD
Directional drilling is faster and cheaper for long, curved or flexible-pipe runs and needs only small pits. Auger boring wins where grade is critical, where the owner of the crossing requires a casing, and where the ground would not hold an open HDD bore at the required diameter. Many utility jobs use both: HDD for the long runs and an auger bore for the one highway crossing.
Contractors by area
Auger boring contractors are listed here by state and city. In the Southeast the listed contractor is Davis Underground Solutions. Elsewhere, the national line routes your crossing to a contractor working your area. Estimates are free, and a set of plans or a sketch with the crossing length, casing size and grade is enough to start.
Estimates are free. Call now: (855) 804-1434 — or pick your state below to reach the contractor covering your area.
Find a auger boring contractor by state
Other drilling and boring services
Directional Drilling
Horizontal directional drilling (HDD) for new underground utilities: steered bores under roads, driveways, parking lots, creeks and landscaping with no open trench.
Horizontal Boring
Horizontal boring for conduit, casing and carrier pipe where digging across a surface is not an option.
Pipe Boring
Boring and pulling in HDPE or steel product pipe from a few inches up to large-diameter casings.
Fiber Optic Drilling
Directional drilling for fiber and communications duct: long bores, multiple ducts in one pull, tight easements.
Electrical Conduit Drilling
Bores for primary and secondary power conduit, lighting circuits and site electrical feeds.
Utility Drilling
Multi-utility installs for developers and utilities: power, gas, water, sewer and telecom on one site plan.
Sewer Line Drilling
Directional drilling and boring for new gravity-adjusted force mains, laterals and sewer crossings.
Water Main Drilling
HDD installation of new water mains and service lines, including creek and road crossings.
Gas Line Drilling
Bores for new natural gas mains and services, coordinated with the utility and its operator-qualification rules.
Questions about auger boring
How accurate is auger boring?+
Line and grade are set by the track in the launch pit and held by the casing. Standard tolerances for a cased bore are within a few inches over a 100-foot crossing, and tighter with pilot-tube or steering-head guidance for gravity sewer.
What casing sizes do auger boring contractors install?+
Most crews handle 8- to 48-inch steel casing; larger machines bore 60 inches and up. The casing is sized to carry the product pipe on spacers with room for the end seals.
How big are the pits?+
The launch pit must hold the track and a casing section, so it is typically 25 to 40 feet long and shored. The receiving pit is smaller. Both are restored when the crossing is complete.
Can auger boring be done under a live railroad?+
Yes; it is the method most railroads require. The railroad issues a crossing agreement, specifies casing wall thickness and depth, and usually requires a flagger and insurance naming the railroad. Your contractor should have done these before.
What does an auger bore cost compared to directional drilling?+
Per foot, a cased auger bore costs more because of the pit, the steel casing and the welding. Over a 100-foot highway crossing the difference is often smaller than it looks once the casing the permit requires is counted either way. Estimates are free from the listed contractor.