Who we work for
Commercial directional drilling
Shopping centers, offices, warehouses, data centers and industrial plants bore because cutting a parking lot or a loading dock costs more than the pipe. Here is what gets bored on a commercial site and how to plan it.
What commercial sites bore
Primary and secondary power from the utility to transformers and switchgear, water and fire-service lines from the main to the building, gas services, telecom and fiber duct from the right-of-way to the building, EV-charging feeds across parking fields, irrigation mains under drives, and sewer or storm crossings under truck courts. On an occupied site, every one of those crosses pavement that has to stay open to customers, tenants or trucks.
Data centers and large sites
Data-center campuses bore duct banks of many conduits for power and fiber between buildings and to the utility right-of-way, often under roads that are already built. Distribution centers bore long runs of conduit and water around truck courts. The bores are larger, the pullbacks heavier and the coordination with the utility tighter, and the contractor's experience with duct banks is the thing to check.
Planning on a tenant-occupied site
Pits are placed where a few parking stalls can be closed, bores are sequenced around deliveries and business hours, and traffic control is part of the quote. Potholing existing services at crossings is cheap insurance on a site with decades of undocumented utilities. The as-built from each bore goes to the owner so the next tenant improvement does not hit it.
Who hires the driller
General contractors, electrical and mechanical contractors, site developers and facility owners. The drilling contractor builds to the engineer's drawings and the utility's standards and coordinates the crossings.
Contractors by area
Commercial drilling contractors are listed here by state and city. In the Southeast the listed contractor is Davis Underground Solutions, which bores site utilities and duct banks for developers and data-center and industrial projects across the region. Elsewhere the national line routes your job to a contractor working your area. Estimates are free.
Services
Directional Drilling
Horizontal directional drilling (HDD) for new underground utilities: steered bores under roads, driveways, parking lots, creeks and landscaping with no open trench.
Horizontal Boring
Horizontal boring for conduit, casing and carrier pipe where digging across a surface is not an option.
Auger Boring
Steel-cased auger bores for road, rail and railroad crossings that need a straight, on-grade casing.
Pipe Boring
Boring and pulling in HDPE or steel product pipe from a few inches up to large-diameter casings.
Fiber Optic Drilling
Directional drilling for fiber and communications duct: long bores, multiple ducts in one pull, tight easements.
Electrical Conduit Drilling
Bores for primary and secondary power conduit, lighting circuits and site electrical feeds.
Utility Drilling
Multi-utility installs for developers and utilities: power, gas, water, sewer and telecom on one site plan.
Sewer Line Drilling
Directional drilling and boring for new gravity-adjusted force mains, laterals and sewer crossings.
Water Main Drilling
HDD installation of new water mains and service lines, including creek and road crossings.
Gas Line Drilling
Bores for new natural gas mains and services, coordinated with the utility and its operator-qualification rules.
Questions
Can utilities be bored under an occupied parking lot?+
Yes. Pits take a few stalls at each end and the bore runs under the rest; the pavement between is untouched and traffic control keeps the lot open.
How large a duct bank can be bored?+
Bundles of a dozen or more conduits, or a large casing carrying them, are installed under roads and parking areas on data-center and campus projects. The rig and the reamed hole are sized to the bundle.
Who coordinates with the utility on a commercial feed?+
The drilling contractor builds the conduit or pipe to the utility's specification and the electrical or mechanical contractor and the utility make the connections. Get the utility's standard before the bore plan is drawn.