Skip to content

Directional drilling & boring · Drilling and boring contractors in all 50 states

(855) 804-1434

D Directional-Drilling.net

Who we work for

Municipal directional drilling

Cities, counties and utility districts bore because a street that stays open is cheaper than one that is cut, backfilled and repaved. Here is where HDD fits in municipal work.

Call (855) 804-1434Estimates are free. Call now.

Water-main renewal under live streets

The most common municipal bore is a new water main installed beside or below the old one while the old one stays in service. Services are transferred one at a time, the new main is tested and disinfected, and the old main is abandoned. The pavement is cut only at tie-ins and services. Programs that once closed a street for a block a week now finish a block in days with traffic moving.

Sewer

Force mains from lift stations and pressure-sewer systems are bored like water mains. Gravity sewer crossings under highways and railroads are installed by auger boring in a steel casing on exact grade. Sewer-separation and storm-drain crossings use the same methods.

Fiber, signals and lighting

City fiber networks, traffic-signal interconnect and street-lighting conduit run along every arterial and cross every intersection. Boring the conduit between handholes keeps the intersections open and the pavement intact, and leaves spare duct for the next system.

Procurement and specifications

Most municipalities specify HDD by reference to ASTM F1962 for pipe pullback design and their own standards for cover, pipe material, tracer wire, testing and restoration. Bids are per foot by diameter with crossings, pits and traffic control as separate items. A pre-bid meeting on the ground, with the utility records on the table, is the best predictor of a bore program that finishes on schedule.

Contractors

Municipal drilling contractors are listed here by state and city. In the Southeast the listed contractor is Davis Underground Solutions, which bores for cities, counties and utility districts across the region. Elsewhere the national line routes your project to a contractor working your area. Estimates and pre-bid site walks are free.

Services

Questions

Can a city replace a water main without closing the street?+

Yes. The new main is bored while the old one stays in service, services are switched over and the old main is abandoned in place. Only the tie-in and service pits are cut.

What specification governs municipal HDD?+

Most agencies reference ASTM F1962 for the pullback design and their own standards for cover, pipe, testing and restoration. Ask the contractor for the bore plan and pullback calculation on each crossing.

Is auger boring or HDD better for a gravity sewer crossing?+

Auger boring with a casing for grade-critical crossings and under highways and railroads; HDD for force mains, pressure sewer and short gravity runs with adequate slope.

Free Estimates

Tell us what needs to go in the ground in the United States.

Length of the run, what is being installed (conduit, duct, water, sewer, gas), what it has to cross, and where the plans stand. A crew that bores for a living can usually price it from that and a site walk.

Estimates are free. Call now. (855) 804-1434
  • ✓ Road, driveway, creek and rail crossings without cutting the surface
  • ✓ Conduit, duct, casing and product pipe from 2" to large diameter
  • ✓ Locates, bore plans and utility coordination handled
  • ✓ Crews travel; a mobilization fee is quoted up front on far jobs

Request a free estimate

We match you with a drilling contractor covering the United States.

No obligation. Your details go only to the drilling contractor handling your area.